SELFBUILD BARN CONVERSION |
||
| Original
Pictures |
These
pictures were taken on 28 December 2006 during our initail viewing and
second viewing on 13 January 2007. |
|
| Helping
to clear the barn |
All
hands on deck, it took a few weekends but finally the barn was emptied
out. |
|
| Inital
site works continue |
Getting the site set up - electric, water and more clearing. |
|
Clearing
the paddock |
Cutting
the grass down, fixing the fences and planting hedging/fruit trees. |
|
Garage
wall |
Replacing
the horrible orange brick with reclaimed brick - which has yet to be
aged & blended to the old brick. |
|
Stone
Wall Rebuild |
Ooops
- a stone wall came down whilst getting a big tree out, so we set to
and rebuilt it and repointed the rest. |
|
The
Roof |
Stripping
off the old slate & steel sheets, repairing the old timbers. Fitting
the felt & membrane then slating. |
|
Aug
2008 |
This
month went really well with lots of people helping us out, we manage
to get 5 new window openings complete and one other rebuilt, roofing
finished - ridge tiles on, guttering fitted and the scaffolding removed. |
|
Sept
2008 |
Once
again things really seem to be moving on now, with us digging out the
ground floor levels. Back filling with hardcore, sand, DPM, insulation
and concrete. Screed and UFH to follow at a later time. |
|
Winter |
The
cold months slowed us down somewhat but we pushed on and fitted wall trimmers
throughout all rooms for the first floor joist and made a lot of repairs
to the brickwork plus opening/repairing windows. |
|
Feb
- March 2009 |
Work
continues on shaping the amenity space, fitting a new fence, digging out
the levels and building retaining walls. |
|
March
2009 |
Final
preparation work takes place and the Atrium gets installed. With the 10"
x 10" corner post, it looks really sturdy and should be even nicer
once it starts to weather. |
|
April
2009 |
April
sees us starting to glaze the Atrium - just got the A frame to finish off
and we got some more stone walling sorted in the amenity area. |
|
May/June
2009 |
These
two month have gone really quick for us, we managed to get the
Atrium glass finished, a front door fitted, the amenity steps built
and
grass seed sewn, sewage treatment plant fitted plus all drain
pipes are now underground, a hard core driveway laid and the courtyard
re-leveled. As if that's not enough, we also fitted all the first
floor joists. |
|
July/Aug
2009 |
As
summer passes by quickly, we've managed to get the back garden
completed, built a fireplace and fitted all 19 windows and 2 more external
doors including the glazing. Garage doors are on order but will take up
to 6 weeks as they are special order from German. Ohh and we also
cut out the internal door ways in the main butress walls. |
|
Sept
2009 |
September
has been a good productive month for us, most diamond & cross wall
vents have been repaired or re-opened, the shed/wood store has been partially
clad, a 'crazy-pave' style slate path laid in the back garden.
Last but
not least we cracked
on to lay the floor insulation, heating pipes and liquid screed. Garage
doors have been delivered from Germany - but no time left for installation
- first job for October. |
|
July
2010 |
Well.............. A quick chance to update the site, after a 3 month break over that cold cold winter We're back in the swing and managed to get the garage doors on, internal windows fitted (over the vent holes), landscaping, gardening, stud walls and started on the insulation. A few new pic's added to the 'Misc' page which is found from the top of this page. |
|
Nov
2010 |
Things
are changing quick for now, stairs going in (need a good coat of wax oil),
Oak flooring going down upstairs, stud walling and insulation continues,
still found time for a bit of landscaping and cobbling though. |
|
Oct
2011 |
Just
remembered I've got a website so lots of bits at once: stud
walls, insulation, workshop (not a kitchen) and a few bits n' bobs. |
|