One week on and the TPRS now have the fibreglass ground out of the centres to open up the returns.
The fibreglass top coat is applied in a matt-black finish to all surfaces and along the top edge of the wall
Once the topcoat had dried, another bead of mastic was applied to all pipe returns and the skimmer joint.