building my villa +++
Started in may 2003 and built the structure
through a beautiful hot summer; bathroom finished in summer 04:
sauna keeps eluding me (built in spring 2006)
newer pictures at the bottom
May/June 2003
First jobs...
were digging a 2 ft deep trench for mains drainage
and water and elecricity supplies, then six 2 feet deep holes for the
4X4 inch treated posts from which the whole structure is hung.


We got all the roof beams up in one day after spending hours with a text
book and calculator working out the angles they should be cut. After the
first master, cutting the others was speedy work for two of us. It was
a beautiful day with dappled sunlight coming through the leaves.

The floor is treated chipboard.

Covering the explicit structure of the framework seemed a bit sad. Shiplap on the walls and roofing
felt on the top, hard to work with on a hot afternoon.

Working out the pattern of how to lay the slates (not real ones) down was taxing. The
uPVC windows were given to me by my sister-in-law. On a Victorian house
they would look dreadful but in this context they are fine.


the door was from the dump (sorry, the recycling centre) and cost £10 or £15.

Now there's an inside and and outside. I remember the smell of sawn wood.

for pictures from July and August click here
for pictures from September and November click
here
for pictures from dark December click here
for pictures from February 04 click here
for pictures from March and April 04 click here
for pictures from may 04 click here
to see the end of phase 1 June 2004 click here
|