|
Please note: contact details (especially e-mail addresses and Railfuture's regstered address) may have changed since
the edition of RailEast was produced. Please use the addresses on the HOME PAGE of this web-site.
|
| 2013 |
RAIL EAST 157 February 2013 |
Great Eastern aspirations; East West Rail progress update; East Suffolk future; Haverhill reopening; GA Franchise commitments; Rail fares out of control |
| 2012 |
RAIL EAST 156 November 2012 |
Meldreth, Shepreth and Foxton RUG wins award; Halesworth passenger count; Behind the scenes of Ely-Norwich signalling |
RAIL EAST 155 September 2012 |
New footbridge at St Neots; Rail prospectus for East Anglia; East Coast and Thameslink/GN franchise consultations |
RAIL EAST 154 June 2012 |
King's Cross concourse; Station patronage figures; Beccles loop; Foxton level crossing; Ely freight loops |
RAIL EAST 153 February 2012 |
40th anniversary of East Anglia branch; Peterborough station revamp (platform diagrams) |
| 2011 |
RAIL EAST 152 November 2011 |
Abellio awarded interim Greater [East] Anglia franchise; cable theft and disruption to Rail services |
RAIL EAST 151 September 2011 |
Report concludes that reopening Soham railway station is feasible; Whitemoor open day |
RAIL EAST 150 June 2011 |
Looking back on 150 editions of RailEast; why the branch supports HS2; the need for Chesterton station; franchise aspirations |
RAIL EAST 149 February 2011 |
Timetable changes, service improvements and longer trains; Overcrowing at London terminals; Ely-Norwich signalling go-ahead |
| 2010 |
RAIL EAST 148 November 2010 |
Preview of NXEA's new Class 379 trains; Beccles loop on target for 2012; station surveys by Railfuture |
RAIL EAST 147 September 2010 |
Passenger Focus' survey "What passengers want from the new Greater Anglia franchise"; Ely to Norwich resignalling; Barrington freight traffic could resume |
RAIL EAST 146 June 2010 |
Greater [East] Anglia franchise consulltation; Hitchin Flyover progress; Soham station; East Anglia station footfall 2008/9 |
RAIL EAST 145 February 2010 |
Rail review of 2009 and hopes for 2010; Beaulieu Park station; 'right-time' punctuality |
| 2009 |
RAIL EAST 144 December 2009 |
NR's proposed timetable for the East Coast Main Line; Chesterton station plans; branch meeting with Cambs County Council |
RAIL EAST 143 September 2009 |
Passenger Focus Rail Satisfaction Survey; How to get Senior Railcard discounts; ATOC Connecting Communities report |
RAIL EAST 142 June 2009 |
Big Infrastructure Plans for West Anglia Route; Network Rail plans for Control Period 4 |
RAIL EAST 141 February 2009 |
Railfuture's relaunched East West Rail Link campaign; Swiss travel experience compared to East Anglia |
| 2008 |
RAIL EAST 140 November 2008 |
FCC plans to ease overcrowding on Cambridge-King's Cross route; St. Neots station "reborn". |
RAIL EAST 139 September 2008 |
Platform extension work for 12-coach trains at Cambridge commences; Chiltern's EWRL plans for London-Oxford via Bicester. |
RAIL EAST 138 June 2008 |
Vision of the railway in 2057; Network Rail leases Brandon staiton its 'Friends'; Norfolk Rail Alliance. |
RAIL EAST 137 January 2008 |
Publication of Greater [East] Anglia RUS final report; 'one' becomes National Express East Anglia; Sheringham level crossing. |
| 2007 |
RAIL EAST 136 September 2007 |
Branch reports to Stansted Airport Strategy, and airport gets more trains; Stagecoach wins East Midlands franchise. |
RAIL EAST 135 June 2007 |
Network Rail issues its Regional Strategy; FCC consults on timetable changes; East Coast franchise renewal. |
RAIL EAST 134 February 2007 |
FCC plans to tackle overcrowding; Objection to relocation of Lowestoft station; Cambs County Council may pull out of EWRL scheme. |
| 2006 |
RAIL EAST 133 November 2006 |
Whittlesey station passenger counts; need for canopies at Cambridge station; call for Thameslink Programme to be funded. |
RAIL EAST 132 September 2006 |
To be added. |
RAIL EAST 131 June 2006 |
East West Rail Link on 'tipping point' of go-ahead. Aylesbury North station is funded. |
RAIL EAST 130 February 2006 |
Cambridge to St.Ives guided busway recomended by inspector and approved by Secretary of State. |
| 2005 |
RAIL EAST 129 November 2005 |
To be added. |
RAIL EAST 128 September 2005 |
To be added. |
RAIL EAST 127 June 2005 |
To be added. |
RAIL EAST 126 February 2005 |
To be added. |
| 2004 |
RAIL EAST 125 November 2004 |
To be added. |
RAIL EAST 124 Sept 2004 |
To be added. |
RAIL EAST 123 June 2004 |
St.Ives guided busway gets 2,730 objections. Planning for Ipswich tunnel closure. |
RAIL EAST 122 February 2004 |
To be added. |
| 2003 |
RAIL EAST 121 November 2003 |
To be added. |
RAIL EAST 120 August 2003 |
SRA issues revised tender documents to the three bidders: GB Railways, Arriva and National Express;
CAST.IRON plans railway reopening |
RAIL EAST 119 May 2003 |
March yard to reopen as major depot; Thameslink 2000 refused permission. |
RAIL EAST 118 February 2003 |
SRA calls on rail user groups to work from within; no funding (yet) for guided busway; FGE's
new trains. |
| 2002 |
RAIL EAST 117 October 2002 |
Cambridge-Norwich service launched; Community Rail Partnership for Gainsborough
Line; Blockade strategies for railway renewals; Camridge guided busway plans advance. |
RAIL EAST 116 June 2002 |
Nine bidders for Greater Anglia franchise; LOIS - A12 multi-modal study possible
schemes announced; Suffolk rail passenger policy; STEER rail proposals. |
RAIL EAST 115 February 2002 |
SRA publishes the Strategy for the Railways; "A Rail Strategy for East Anglia" 10 years on. |
| 2001 |
RAIL EAST 114 November 2001 |
Wanted - A National Rail Policy; SRA's Richard Stuart at Branch Meeting. |
RAIL EAST 113 August 2001 |
CHUMMS report issued; A47 study announced. |
RAIL EAST 112 June 2001 |
To be added. |
RAIL EAST 111 February 2001 |
To be added. |
| 2000 |
RAIL EAST 110 November 2000 |
To be added. |
RAIL EAST 109 September 2000 |
To be added. |
RAIL EAST 108 May 2000 |
To be added. |
RAIL EAST 108 February 2000 |
To be added. |
| |
|