ISOM front page  Map style index  Text index  Land forms index  Rock and boulders index  Water and marsh index  Vegetation index  Man-made features index  Overprinting and technical symbols index  OCAD symbols index  email to author

Major road 502

See Also...501  503   ISOM Index  Man-made features index previous   next

This page contains content from ISOM2000   This page contains content from Ashby Mapping  Ski-O symbol  Mountain Bike-O symbol  revision 05/00

Specifications

502 Major road

Road wider than 5m. The width of the symbol should be drawn to scale but not smaller than the minimum width. The outer boundary lines may be replaced with symbols 519, 521, 522 or 524 if a fence or wall is so close to the motorway edge that it cannot practically be shown as a separate symbol. The space between the black lines must be filled with brown (50%). A road under construction may be shown with broken lines.

Colour: black and brown 50% (60 lines/cm).

Black line widths 0.18mm Spacing between lines 0.5mm

ISOM 1990 Definition

502 Major road

Road wider than 5m. The space between the black lines must be filled with brown (50-100%). A road under construction (symbols 501, 502 and 503) may be shown with broken lines.

Colour: black and brown 50-100% (40 lines/cm).

Black line widths 0.175mm Spacing between lines 0.5mm

The overall width was 0.85mm which is 12.75m on the ground

OCAD Methods

Defined as double line symbol 502.0, uses special road colours to allow automatic knocking out of borderlines by the fill. This allows easy digitising of junctions and roundabouts.

The default fill colour is defined as a 50% brown tone (street infill colour number 15), but will also knock out the normal, lower, browns including contours.

Can be drawn with any drawing tool, but bézier mode is the most efficient. Do not allow bézier handles to overlap or very strange effects occur!

Drawing Considerations

This is a symbol, not a scale representation of a motorway, so some adjustment of neighbouring features may be needed.

The overall width is 0.86mm which is 12.9m on the ground

Pictorial Descriptions

- BOF Rules, Appendix One

Road: a metalled/asphalt surfaced or dirt road, suitable for vehicles in all weathers.

To make a pecked edge to a road for the under construction symbol you can:-

Duplicate the symbol, and redefine it, pecked lined are an option for double line symbols, or

If it is a small section, edit the edge with the cut tool, only the edge will be broken.

More tips on the other road symbols page.

Click to go to the top of this page


International Specification for Orienteering Maps produced by the International Orienteering Federation
OCAD produced by Hans Steinegger Software. © 1988-1999 Hans Steinegger. ® OCAD is a registered trademark of Hans Steinegger
This document has been written and coded by Peter Hornsby of Ashby Mapping
Apologies for any mistakes and errors; please inform details of any problems, thanks.
Produced for the Ashby Mapping internet site on 20 November 1997 and 1 December 1999  ©1997-2000 Ashby Mapping
Revised 28 December 1999, 23 March 2000