The company specialises in Refurbishment work and accounts
for approimately 70% of the annual turnover. We cover all
disciplines in this field, but around 60% of all refurb work is built
up felt roofing.
The majority of the Felt roofing we carry out is to Industrial buildings,
Public Buildings and Schools. Industrial building cause very few complications
and with basic safety procedures in place are usually very straight
forward. Usually access is excellent and keeping the public &
staff a safe distance is a simple task.
We have carried out some major refurbishment work on shopping areas
etc were the public safety is a major concern, without incident and
on schedule.
Please
click on the images below to enlarge.
Before
& After Photographs of Nickelson Way
-
brus images
This
is Brus Corner Shops in Hartlepool, which consists of 27 small busy
shops. This block was part of Hartlepool Borough Councils Urban Renewal
Programme & all shops were in full use during the works. We had
an 8 week contract period which included, Strip & recover, new
40mtr Lead box gutter & new 170mm pvc guttering.
Public Schools are an altogether different proposition. Usually all
works are completed during school holidays, but as we proved last
year, this is unnecessary with the correct safety procedures in place.
We carried out a 1000 sq mtr refurbishment to Brierton School during
term time without incident. The works consisted of some strip &
recover & some over roof systems. 400 sq mtrs was renewed in Plastisol
Coated Steel sheeting which gave the building a more modern look,
as a pose to the 1960s drab pitched felt.
- This
picture shows a high level roof covered in steel cladding to give
a more modern look
Below
- Leadwork at WH Smith in Newcastle upon Tyne.