DEVELOPMENT WARNING
This Page flickers in Netscape Navigator and does not provide the intended "fly-over" capability; I believe this to be a minor problem at this point in time, but will address the issue as soon as practical
CONTENT WARNING
This content of this page remains incomplete; with very few of the listed entries having their appropriate definitions. Where possible, and time permitting, external links will be provided to qualify the definitions provided herein.
Definitions
- AB
Authorised Budget
Refer BACA.
- AC
Actual Cost
AC is the actual (total) cost (units or fiscal-value) incurred during the execution of completed work within a Body of Work (BoW) up to a specified point in time; which, unless otherwise stated, would be the Data Date.
- AT
Actual Time
A normalised (with respect to timeframe unit) elapsed time from the commencement of work within a Body of Work (BoW).
- BAC
Budgeted At-Completion
A Budgetary Control term for the Total Budget assigned to the activities within a Body of Work (BoW); this is also known as the Planned Value (PV) for that Body of Work.
- BACA
Budgeted At-Completion (Authorised)
A Budgetary Control term for the Total Authorised Budget assigned to a Body of Work (BoW); i.e. that limiting budget that has been approved to be spent in the conduct of a Body of Work (BoW).
- BACA1
Budgeted At-Completion (Authorised) factor 1
A Budgetary Control term for the Total Authorised Budget assigned to a Body of Work (BoW) during a Formal Reissue of that Budget ; i.e. that limiting budget that has been approved to be spent in the conduct of a Body of Work (BoW).
Refer BRN.
- BACA2
Budgeted At-Completion (Authorised) factor 2
A Budgetary Control term for the Total Authorised Budget Amendments applied to a Body of Work (BoW) since a Formal Reissue of that Budget ; i.e. that total budget amendment that has been approved to be spent in the conduct of a Body of Work (BoW).
Refer BCN.
- BACB
Budgeted At-Completion (Baseline)
A Budgetary Control term for the Total Budget that is indicated as "required to complete a Body of Work (BoW)" and which is defined in a Baseline Network/Plan.
- BACC
Budgeted At-Completion (Current Plan)
A Budgetary Control term for the Total Budget that is indicated as "required to complete a Body of Work (BoW)" and which is defined in the Current Network/Plan.
- ΔBACAB
Variance in the Budgets At-Completion (Authorised 'versus' Baseline)
A Budgetary Control term for the Variance in indicated Total Budgets for a Body of Work (BoW)" and which is utilised as a Management Criteria.
- ΔBACAC
Variance in the Budgets At-Completion (Authorised 'versus' Current Plan)
A Budgetary Control term for the Variance in indicated Total Budgets for a Body of Work (BoW)" and which is utilised as a Management Criteria.
- ΔBACBC
Variance in the Budgets At-Completion (Baseline 'versus' Current Plan)
A Budgetary Control term for the Variance in indicated Total Budgets for a Body of Work (BoW)" and which is utilised as a Management Criteria.
- BCN
Budgetary Change Note
A Budgetary Control term for the authorised request for a Budget Amendment
- BCR
Budget Change Request
A Budgetary Control term for the pre-authorised request for a Budget Amendment
- BCS
Budgetary Control System
A Budgetary Control term for the system that administers Budget Control and Amendment
- BRN
Budget Release Note
A Budgetary Control term for the Authorised Release of a Budget
- CAM
Cost Account Manager
Refer "Responsible Manager
- CAP
Cost Account Point
Desc. TBC
- CAS
Cost Account Structure
A Budgetary Control term describing the hierarchy that aggregates the costs incurred during the conduct of multiple Bodies of Work (BoW).
- CBB
Contract Budget Baseline
Desc. TBC
- CPI
Cost Performance Index
An EVM term representing the fiscal efficiency of the Costs Incurred during the conduct of work, versus the "Value" which that represents
Mathematically

- CRT
Critical Ratio (Time-Based)
An EVM term...
Mathematically

- CRV
Critical Ratio (Value-Based)
An EVM term...
Mathematically

- CTC
Contract Target Cost
Desc. TBC
- CV
Denoting "Cost Variance".
An EVM term; CV is the difference between the Earned Value (EV) and the Actual Costs (AC) of a Body of Work (BoW) at a specific point in time; which, unless otherwise stated, would be the Data Date.
Mathematically

- CV%
Cost Variance (Percentage)
An EVM term representing a normalised variance between the Costs Incurred during the conduct of work and the apparent "Value" of that work
Mathematically

- DD
Data Date
A Network/Plan term for the Data Date (or Status Date) applied during a Network Scheduling Event
- EAC
Estimate At Complete
A Budgetary Control or EVM term indicating the projected Total Budgetary Requirements of a Body of Work (BoW).
- ES
Earned Schedule
An EVM term indicating a purely time-based derivation of the Schedule Performance Metrics.
- ETC
Estimate To Complete
A Budgetary Control or EVM term indicating the projected Budgetary Requirements for incomplete work within a Body of Work (BoW).
- EV
Earned Value
EV is the budgeted amount (units or fiscal-value) for the work actually completed within a Body of Work (BoW) up to a specified point in time; which, unless otherwise stated, would be the Data Date.
- EVM
Earned Value Management
Definition To Be Provided.....
- EVMS
Earned Value Management System
Definition To Be Provided.....
- FM
Factored Mean
Definition to be provided
- IEAC
Independent Estimate At Complete
Definition To Be Provided.....
- IECD
Independent Estimate of Completion Date
Definition To Be Provided.....
Mathematically

- IED
Independent Estimate of Duration (At Completion)
Definition To Be Provided.....
Mathematically

- IEDCR
Independent Estimate of Duration (At Completion)
Definition To Be Provided.....
Mathematically

- MR
Management Reserve
Desc. TBC
- OBS
Organisational Breakdown Structure
Desc. TBC
- OTB
Over Target Baseline
Desc. TBC
- PD
Project Duration
Definition To Be Provided.....
- PDWR
Planned Duration of Work Remaining
Definition To Be Provided.....
Mathematically

- PMB
Performance Management Baseline / Performance Measurement Baseline
Definition To Be Provided.....
- PR
Project Reserve
Definition To Be Provided.....
- PSD
Project Start Date
Definition To Be Provided.....
- PV
Planned Value
PV is the budgeted cost (units or fiscal-value) for the work intended to be complete on a Body of Work (BoW) up to a specified point in time; which, unless otherwise stated, would be the Data Date.
- RM
Responsible Manager
Desc. TBC
- SoW
Statement of Work
Definition To Be Provided.....
- SPIT
Schedule Performance Index (Time-based)
Definition To Be Provided.....
Mathematically

- SPIV
Schedule Performance Index (Value-Based)
Definition To Be Provided.....
Mathematically

- SVT
Schedule Variance (Time Based)
An EVM(ES) term; SVT is the time-domain difference between the Earned Value (EV) and the point in time where the Planned Value (PV) equals that of the Earned Value (EV) of a Body of Work (BoW).
EV is normally stated in terms of an applicable Data Date. The date at which PV=EV is not normally the Data Date
Mathematically

Where:
- D(PV=EV) is the Date at which PV = EV
- D(PS) is the date of Project Start
- D(EV) is the date at which the EV is being analysed
Interpretation:
- SVT >1: Over Performing Against Baseline Schedule
- SVT =0: Performing As Per Baseline Schedule
- SVT <1: Under Performing Against Baseline Schedule
- SV%T
Schedule Variance Percentage (Time-Based)
An EVM(ES) term representing a normalised duration variance between the Earned Value and a point in time where the Planned Value equals the current Earned Value.
Mathematically

- SVV
Schedule Variance (Value Based)
An EVM term; SVV is the difference between the Earned Value (EV) and the Planned Value (PV) of a Body of Work (BoW) at a specific point in time; which, unless otherwise stated, would be the Data Date.
Mathematically

- SV%V
Schedule Variance (Percentage)
An EVM term representing a normalised apparent duration variance between the Earned Value and the Planned Value of a Body of Work (BoW).
Mathematically

- TAB
Total Allocated Budget
Desc. TBC
- TCCPI
To-Complete Cost Performance Index
An EVM term representing the fiscal efficiency that must be achieved in the conduct of remaining work within a Body of Work (BoW) to ensure that the Total Allocated Budget is not overspent
Mathematically

- TCSPIV
To-Complete Schedule Performance Index (Value-Based)
An EVM term representing the fiscal efficiency that must be achieved in the conduct of remaining work within a Body of Work (BoW) to ensure that the Budgeted Project Duration is not overrun
Mathematically

- TCSPIT
To-Complete Schedule Performance Index (Time-Based)
An EVM(ES) term representing the time-based efficiency that must be achieved in the conduct of remaining work within a Body of Work (BoW) to ensure that the Budgeted Project Duration is not overrun
Mathematically

- UB
Undistributed Budget
Desc. TBC
- VAC
Variance At Complete
Definition To Be Provided.....
Mathematically

- VAC%
Variance At Complete (Percentage)
Definition To Be Provided.....
Mathematically

- VE
Value yet to be Earned
Desc. TBC
- WBS
Work Breakdown Structure
Desc. TBC