Acronyms
- AB
Authorised Budget
That Budget which has been approved/authorised to be expended during the conduct of a Body of Work.
Refer BACA
- AC
Actual Cost
The Actual Costs Incurred (to date) during the conduct of a Body of Work.
- AF
Actual Finish
The point in time where work actually finished on a Planned Activity.
- ACWP
Actual Cost of Work Performed
[arch] Refer to AC (Actual Cost) for the terminology employed within this Web-Site.
- APM
Association of Project Management
A Professional Institution whose mission is "To develop and promote the professional disciplines of project and programme management for the public benefit"
- AS
Actual Start
The point in time where work actually started on a Planned Activity.
- AT
Actual Time
The normalised, elapsed-time of the Data Date from the Project Start Date.
e.g. (Data Date - Start Date) / Unit of measure
- BAC
Budgeted At-Completion
That Budget which is indicated as required to be expended during the conduct of a Body of Work.
- BACA
Budgeted At-Completion (Authorised)
That Budget which has been approved/authorised to be expended during the conduct of a Body of Work.
- BACA1
Budgeted At-Completion (Authorised) factor 1
That Budget which was formally approved/authorised to be expended during the conduct of a Body of Work during the last formal review.
- BACA2
Budgeted At-Completion (Authorised) factor 2
That Budget which has been formally approved/authorised to be expended during the conduct of a Body of Work since the last formal review.
- BACB
Budgeted At-Completion (Baseline)
That Budget which is indicated as being required to be expended during the conduct of a Body of Work and which is documented in the Baseline Plan.
- BACC
Budgeted At-Completion (Current Plan)
That Budget which is indicated as being required to be expended during the conduct of a Body of Work and which is documented in the Current Plan.
- ΔBACAB
Budget At-Completion Variance( Authorised 'versus' Baseline)
The difference between the Authorised Budget At Completion(BACA) and the Baseline Budget At Completion (BACB)
Where: ΔBACAB = BACB - BACA
Positive indicates an overly lax performance management context.
Negative indicated an overly stringent performance management context.
- ΔBACAC
Budget At-Completion Variance (Authorised 'versus' Current Plan)
The difference between the Authorised Budget At Completion(BACA) and the Current Budget At Completion (BACC)
Where: ΔBACAC = BACC - BACA
Positive indicates a cost base increase against available funding.
Negative indicated a cost base reduction against available funding.
- ΔBACBC
Budgets At-Completion Variance (Baseline 'versus' Current Plan)
The difference between the Baseline Budget At Completion(BACB) and the Current Budget At Completion (BACC)
Where: ΔBACBC = BACC - BACB
Positive indicates a cost base increase for performance measurement.
Negative indicated a cost base reduction for performance measurement.
- BCN
Budgetary Change Note
A Budget Amendment Increment which has been formally approved/authorised since the last formal review.
- BCR
Budget Change Request
A Budget Amendment Increment which has not yet been formally approved/authorised.
- BCS
Budgetary Control System
The (IT) System which catalogues all Budget Changes and Allocations.
- BCWP
Budgeted Cost of Work Performed
[arch] Refer to EV (Earned Value) for the terminology employed within this Web-Site.
- BCWR
Budgeted Cost of Work Remaining
[arch] Refer to VE (Value yet to be Earned) for the terminology employed within this Web-Site.
- BCWS
Budgeted Cost of Work Scheduled
[arch] Refer to PV (Planned Value) for the terminology employed within this Web-Site.
- BI
Business Intelligence
Refer to Wikipediafor definition.
- BRN
Budget Release Note
The formal documentation that constitutes the BACA.
- CAM
Cost Account Manager
Control Account Manager
That individual who hold the role of "Responsible Manager" for the specified Cost Account / Control Account
- CAP
Cost Account Point
Control Account Point
A specific intersection-point between the Work Breakdown Structure (WBS) and The Cost Account Structure (CAS)
- CAS
Cost Account Structure
The hierarchical structure that enables aggregation of discreet expenditures to an integrated whole.
- CBB
Contract Budget Baseline
The Baseline Plan that provides the definition of the Contract (re. Project) Budget at the time that the contract was let
- CPI
Cost Performance Index
An EVM term for the ratio between Earned Value (EV) and Actual Cost (AC)
- CRT
Critical Ratio (Time-Based)
The product of the Cost Performance Index (value-based) [CPIV] and the Schedule Performance Index (time-based) [SPIT}.
Used as a forward-looking adjustment of Estimate-To-Completion (ETC) Costs based on historic performance.
- CRV
Critical Ratio (Value-Based)
The product of the Cost Performance Index (value-based) [CPIV] and the Schedule Performance Index (value-based) [SPIV}.
Used as a forward-looking adjustment of Estimate-To-Completion (ETC) Costs based on historic performance.
- CSS
Cascading Style Sheets
That portion of a Web-Site that controls the formatting/placement of the Web-Page content (e.g. Text/Images)
- CTC
Contract Target Cost
The Strategic Targeted Expenditure during the conduct of work to enable the achievement of the projected Profit Level.
- CV
Cost Variance
The variance between the Earned Value (EV) and the Actual Costs (AC).

- CV%
Cost Variance (Percentage)
The normalised variance between the Earned Value (EV) and the Actual Costs (AC).

- DBMS
Database Management System
Refer To WikipediaDefinition
- DD
Data Date
That Date which has been used during the Statusing / Updating of a Plan
- DW
Data Warehouse
Refer To Wikipedia Definition
- EAC
Estimate At Complete
Estimate At Completion
The projected budgetary requirement during the conduct of a Body of Work.
- EF
Early Finish
The Earliest Date an Activity could Finish, based upon Activity Relationships.
- ES
Early Start
The Earliest Date an Activity could Finish, based upon Activity Relationships.
Earned Schedule
The Earned Value complementary analysis using elapsed-time.
- ETC
Estimate To Complete
Estimate To Completion
The projected budgetary requirement yet to be expended during the conduct of a Body of Work.
- EV
Earned Value
That portion of the Budget that has been indicated as having been achieved.
- EVM
Earned Value Management
A discipline for estimating the Value of expended costs against the budgeted allocations.
- EVMS
Earned Value Management System
The (IT) System which facilitates the implementation of EVM.
- FF
Finish-Finish (Activity Connection)
An Activity relationship whereby one activity cannot finish until another activity has been finished.
- FM
Factored Mean
- FS
Finish-Start (Activity Connection)
An Activity relationship whereby one activity cannot commence until another activity has been finished.
This is the most readily used type of Activity Interface.
- FTP
File Transfer Protocol
- HTML
Hyper Text Markup Language
- IEAC
Independent Estimate At Complete
Independent Estimate At Completion
A mathematically "independent" method of integrating planned-intentions and historic-performance as a modifying parameter to the Estimate-To-Complete (ETC) Cost.
- IECD
Independent Estimate of Completion Date
A mathematically "independent" method of integrating planned-intentions and historic-performance as a modifying parameter to the Estimate-To-Complete (ETC) Duration.
- IED
Independent Estimate of Duration (At Completion)
A mathematically "independent" method of integrating planned-intentions and historic-performance as a modifying parameter to the Projects Remaining Duration.
- JDBC
Java Data Base Connectivity
- MR
Management Reserve
The Undistributed Budget held by management as a Contingency
- n
any integer n
- OBS
Organisational Breakdown Structure
The hierarchical structure depicting the "chain of command" or "delegated authority" between Responsible Managers.
- ODBC
Open Data Base Connectivity
- OLAP
On Line Analytical Processing
- OLTP
On Line Transactional Processing
- OTB
Over Target Baseline
- OWC
[Microsoft] Office Web Components
- PD
Project Duration
- PDWR
Planned Duration of Work Remaining
- PMB
Performance Management Baseline
Performance Measurement Baseline
- PMBOK®
Project Management Body Of Knowledge ®
- PMI
Project Management Institute
- PR
Project Reserve
- PSD
Project Start Date
- PV
Planned Value
- RDBMS
Relational Database Management System
- ROLAP
Relational On Line Analytical Processing
- RM
Responsible Manager
- SF
Start-Finish (Activity Connection)
- SoW
Statement of Work
- SPIT
Schedule Performance Index (Time-based)

- SPIV
Schedule Performance Index (Value-Based)

- SS
Start-Start (Activity Connection)
- SVT
Schedule Variance (Time Based)

- SV%T
Schedule Variance Percentage (Time-Based)

- SVV
Schedule Variance (Value Based)

- SV%V
Schedule Variance (Percentage)

- TAB
Total Allocated Budget
- TCCPI
To-Complete Cost Performance Index

- TCSPIV
To-Complete Schedule Performance Index (Value-Based)

- TCSPIT
To-Complete Schedule Performance Index (Time-Based)

- TCP/IP
Transmission Control Protocol / Internet Protocol
- UB
Undistributed Budget
- VAC
Variance At Complete

- VAC%
Variance At Complete (Percentage)

- VE
Value yet to be Earned
- WBS
Work Breakdown Structure
- XML
eXtensible Markup Language
- XSL
eXtensible Stylesheet Language
- XSLT
eXtensible Stylesheet Language [for] Transformation