Acronyms

  • AB
    • Authorised Budget

      That Budget which has been approved/authorised to be expended during the conduct of a Body of Work.

      Refer BACA

  • AC
    • Actual Cost

      The Actual Costs Incurred (to date) during the conduct of a Body of Work.

  • AF
    • Actual Finish

      The point in time where work actually finished on a Planned Activity.

  • ACWP
    • Actual Cost of Work Performed

      [arch] Refer to AC (Actual Cost) for the terminology employed within this Web-Site.

  • APM
    • Association of Project Management

      A Professional Institution whose mission is "To develop and promote the professional disciplines of project and programme management for the public benefit"

  • AS
    • Actual Start

      The point in time where work actually started on a Planned Activity.

  • AT
    • Actual Time

      The normalised, elapsed-time of the Data Date from the Project Start Date.

      e.g. (Data Date - Start Date) / Unit of measure

  • BAC
    • Budgeted At-Completion

      That Budget which is indicated as required to be expended during the conduct of a Body of Work.

  • BACA
    • Budgeted At-Completion (Authorised)

      That Budget which has been approved/authorised to be expended during the conduct of a Body of Work.

  • BACA1
    • Budgeted At-Completion (Authorised) factor 1

      That Budget which was formally approved/authorised to be expended during the conduct of a Body of Work during the last formal review.

  • BACA2
    • Budgeted At-Completion (Authorised) factor 2

      That Budget which has been formally approved/authorised to be expended during the conduct of a Body of Work since the last formal review.

  • BACB
    • Budgeted At-Completion (Baseline)

      That Budget which is indicated as being required to be expended during the conduct of a Body of Work and which is documented in the Baseline Plan.

  • BACC
    • Budgeted At-Completion (Current Plan)

      That Budget which is indicated as being required to be expended during the conduct of a Body of Work and which is documented in the Current Plan.

  • ΔBACAB
    • Budget At-Completion Variance( Authorised 'versus' Baseline)

      The difference between the Authorised Budget At Completion(BACA) and the Baseline Budget At Completion (BACB)

      Where: ΔBACAB = BACB - BACA

      Positive indicates an overly lax performance management context.

      Negative indicated an overly stringent performance management context.

  • ΔBACAC
    • Budget At-Completion Variance (Authorised 'versus' Current Plan)

      The difference between the Authorised Budget At Completion(BACA) and the Current Budget At Completion (BACC)

      Where: ΔBACAC = BACC - BACA

      Positive indicates a cost base increase against available funding.

      Negative indicated a cost base reduction against available funding.

  • ΔBACBC
    • Budgets At-Completion Variance (Baseline 'versus' Current Plan)

      The difference between the Baseline Budget At Completion(BACB) and the Current Budget At Completion (BACC)

      Where: ΔBACBC = BACC - BACB

      Positive indicates a cost base increase for performance measurement.

      Negative indicated a cost base reduction for performance measurement.

  • BCN
    • Budgetary Change Note

      A Budget Amendment Increment which has been formally approved/authorised since the last formal review.

  • BCR
    • Budget Change Request

      A Budget Amendment Increment which has not yet been formally approved/authorised.

  • BCS
    • Budgetary Control System

      The (IT) System which catalogues all Budget Changes and Allocations.

  • BCWP
    • Budgeted Cost of Work Performed

      [arch] Refer to EV (Earned Value) for the terminology employed within this Web-Site.

  • BCWR
    • Budgeted Cost of Work Remaining

      [arch] Refer to VE (Value yet to be Earned) for the terminology employed within this Web-Site.

  • BCWS
    • Budgeted Cost of Work Scheduled

      [arch] Refer to PV (Planned Value) for the terminology employed within this Web-Site.

  • BI
    • Business Intelligence

      Refer to Wikipediafor definition.

  • BRN
    • Budget Release Note

      The formal documentation that constitutes the BACA.

  • CAM
    • Cost Account Manager

      Control Account Manager

      That individual who hold the role of "Responsible Manager" for the specified Cost Account / Control Account

  • CAP
    • Cost Account Point

      Control Account Point

      A specific intersection-point between the Work Breakdown Structure (WBS) and The Cost Account Structure (CAS)

  • CAS
    • Cost Account Structure

      The hierarchical structure that enables aggregation of discreet expenditures to an integrated whole.

  • CBB
    • Contract Budget Baseline

      The Baseline Plan that provides the definition of the Contract (re. Project) Budget at the time that the contract was let

  • CPI
    • Cost Performance Index

      An EVM term for the ratio between Earned Value (EV) and Actual Cost (AC)

  • CRT
    • Critical Ratio (Time-Based)

      The product of the Cost Performance Index (value-based) [CPIV] and the Schedule Performance Index (time-based) [SPIT}.

      Used as a forward-looking adjustment of Estimate-To-Completion (ETC) Costs based on historic performance.

  • CRV
    • Critical Ratio (Value-Based)

      The product of the Cost Performance Index (value-based) [CPIV] and the Schedule Performance Index (value-based) [SPIV}.

      Used as a forward-looking adjustment of Estimate-To-Completion (ETC) Costs based on historic performance.

  • CSS
    • Cascading Style Sheets

      That portion of a Web-Site that controls the formatting/placement of the Web-Page content (e.g. Text/Images)

  • CTC
    • Contract Target Cost

      The Strategic Targeted Expenditure during the conduct of work to enable the achievement of the projected Profit Level.

  • CV
    • Cost Variance

      The variance between the Earned Value (EV) and the Actual Costs (AC).

      Cost Variance
  • CV%
    • Cost Variance (Percentage)

      The normalised variance between the Earned Value (EV) and the Actual Costs (AC).

      Cost Variance
  • DBMS
    • Database Management System

      Refer To WikipediaDefinition

  • DD
    • Data Date

      That Date which has been used during the Statusing / Updating of a Plan

  • DW
  • EAC
    • Estimate At Complete

      Estimate At Completion

      The projected budgetary requirement during the conduct of a Body of Work.

  • EF
    • Early Finish

      The Earliest Date an Activity could Finish, based upon Activity Relationships.

  • ES
    • Early Start

      The Earliest Date an Activity could Finish, based upon Activity Relationships.

      Earned Schedule

      The Earned Value complementary analysis using elapsed-time.

  • ETC
    • Estimate To Complete

      Estimate To Completion

      The projected budgetary requirement yet to be expended during the conduct of a Body of Work.

  • EV
    • Earned Value

      That portion of the Budget that has been indicated as having been achieved.

  • EVM
    • Earned Value Management

      A discipline for estimating the Value of expended costs against the budgeted allocations.

  • EVMS
    • Earned Value Management System

      The (IT) System which facilitates the implementation of EVM.

  • FF
    • Finish-Finish (Activity Connection)

      An Activity relationship whereby one activity cannot finish until another activity has been finished.

  • FM
    • Factored Mean

  • FS
    • Finish-Start (Activity Connection)

      An Activity relationship whereby one activity cannot commence until another activity has been finished.

      This is the most readily used type of Activity Interface.

  • FTP
    • File Transfer Protocol

  • HTML
    • Hyper Text Markup Language

  • IEAC
    • Independent Estimate At Complete

      Independent Estimate At Completion

      A mathematically "independent" method of integrating planned-intentions and historic-performance as a modifying parameter to the Estimate-To-Complete (ETC) Cost.

  • IECD
    • Independent Estimate of Completion Date

      A mathematically "independent" method of integrating planned-intentions and historic-performance as a modifying parameter to the Estimate-To-Complete (ETC) Duration.

  • IED
    • Independent Estimate of Duration (At Completion)

      A mathematically "independent" method of integrating planned-intentions and historic-performance as a modifying parameter to the Projects Remaining Duration.

  • JDBC
    • Java Data Base Connectivity

  • MR
    • Management Reserve

      The Undistributed Budget held by management as a Contingency

  • n
    • any integer n

  • OBS
    • Organisational Breakdown Structure

      The hierarchical structure depicting the "chain of command" or "delegated authority" between Responsible Managers.

  • ODBC
    • Open Data Base Connectivity

  • OLAP
    • On Line Analytical Processing

  • OLTP
    • On Line Transactional Processing

  • OTB
    • Over Target Baseline

  • OWC
    • [Microsoft] Office Web Components

  • PD
    • Project Duration

  • PDWR
    • Planned Duration of Work Remaining

  • PMB
    • Performance Management Baseline

      Performance Measurement Baseline

  • PMBOK®
    • Project Management Body Of Knowledge ®

  • PMI
    • Project Management Institute

  • PR
    • Project Reserve

  • PSD
    • Project Start Date

  • PV
    • Planned Value

  • RDBMS
    • Relational Database Management System

  • ROLAP
    • Relational On Line Analytical Processing

  • RM
    • Responsible Manager

  • SF
    • Start-Finish (Activity Connection)

  • SoW
    • Statement of Work

  • SPIT
    • Schedule Performance Index (Time-based)

      Cost Variance
  • SPIV
    • Schedule Performance Index (Value-Based)

      Cost Variance
  • SS
    • Start-Start (Activity Connection)

  • SVT
    • Schedule Variance (Time Based)

      Cost Variance
  • SV%T
    • Schedule Variance Percentage (Time-Based)

      Cost Variance
  • SVV
    • Schedule Variance (Value Based)

      Cost Variance
  • SV%V
    • Schedule Variance (Percentage)

      Cost Variance
  • TAB
    • Total Allocated Budget

  • TCCPI
    • To-Complete Cost Performance Index

      Cost Variance
  • TCSPIV
    • To-Complete Schedule Performance Index (Value-Based)

      Cost Variance
  • TCSPIT
    • To-Complete Schedule Performance Index (Time-Based)

      Cost Variance
  • TCP/IP
    • Transmission Control Protocol / Internet Protocol

  • UB
    • Undistributed Budget

  • VAC
    • Variance At Complete

      Cost Variance
  • VAC%
    • Variance At Complete (Percentage)

      Cost Variance
  • VE
    • Value yet to be Earned

  • WBS
    • Work Breakdown Structure

  • XML
    • eXtensible Markup Language

  • XSL
    • eXtensible Stylesheet Language

  • XSLT
    • eXtensible Stylesheet Language [for] Transformation