The crew of "Tom Rolt" coaling the loco by hand at Tywyn in 1990.
The scene at Tywyn station on a very wet 19th September 2003.
No.6 "Duncan" reverses onto the train which will form the
1355 service to Nant Gwernol. 19/9/03
"Tom Rolt" on arrival at the upper terminus of the line at Nant
Gwernol (1990)
A similar scene with "Duncan" at Nant Gwernol on 19/9/03.
The guard has brought the
tail lamp from the rear of train and awaits the loco uncoupling.
The guard takes shelter, from the persistant rain, on the footplate
as the loco runs round. 19/9/03
Almost ready for departure from Nant Gwernol 19/9/03
"Dolgoch" hauls a down train over the very beautiful Dolgoch Falls
viaduct. (1990)
"Talyllyn" cossing Dolgoch Falls viaduct. (1990)
The driver of "Peter Sam" exchanges single line token with the signalman
at Abergynolwyn station. (1990)
"Duncan" simmers quietly at Abergynolwyn on 19/9/03.