With thanks to Paul in Security for the Photo |
The following pictures show how we get the delivery box onto the road train
All following pictures are clickable if you wish to see them bigger, in this first , in the foreground is one of the older Scanias without boxes, with a 7.5 tonner in the background ready to go out |
 |
 |
Looking at the Chassis frame, over 16
Mtr from front to back |
| A box on the ground, notice the legs, as these have to be put away / folded |
 |
 |
Putting the end of the wagon under the box, care is
required other wise the lights get mangled!! |
| for simplicity I have not shown mounting the box
on the drag, but now move to aligning the wagon to the drag, notice in the
mirror how the edge of the wagon box is brought into line with that of the
drag behind |
 |
 |
As in the last photo the action is in the mirror,
and both are in alignment , so the last bit backwards can be done until
the coupling engages & the pin fires. All that remains is to couple
up & go |
| Ready to roll!!! |
|