The area before work started
The earthworks start
A lot of soil was removed!
The
area was levelled
Preparing for the hardcore
100 tons of hardcore laid
Ready for the tarmac
The tarmac is laid
a lot of tarmac was used
The basecourse being laid
After the wearing course
layouts tried out
Kerbs in- racing starts
The original rostrum
the covered rostrum
Indoor pitting
more indoor pitting
the track now